Transparency template
Annex I to Regulation (EC) 715/2009 | Link |
3.1.2 a) A detailed and comprehensive description of the different services and their charges |
|
3.1.2 b) u. c) 1. Different transportation contracts and other significant documents |
Documents |
3.1.2 c) Network code / standard conditions |
GTS Network Code |
3.1.2 c) 2. Specification of relevant gas quality parameters |
(Section 1, Chapter 2; Section 3, Chapter 1) |
3.1.2 c) 3. Pressure requirements |
(Section 1, Chapter 2) |
3.1.2 c) 4. Procedure in the event of an interruption of interruptible capacity |
no data |
3.1.2 d) Harmonized procedures applied when using the transmission system, including the definition of key terms |
GTS Network Code |
3.1.2 e) Provisions on capacity allocation, congestion management and anti-hoarding and reutilization procedures |
(Section 9, Section 15) |
3.1.2 f) Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator |
no data |
3.1.2 g) Rules on balancing and methodology for the calculation of imbalance charges |
(Section 14) |
3.1.2 h) Flexibility and tolerance levels included in transportation and with additional charges |
Standard Transportation Agreement (Section 9, Chapter 2) |
3.1.2 i) Detailed description of the gas system of TSO and its relevant points of interconnection / names of the operators of the interconnected systems or facilities |
|
3.1.2 j) Rules applicable for connection to the system |
(Section 6) |
3.1.2 k) Information on emergency mechanisms |
(Section 17) |
3.1.2 l) Procedures agreed at interconnection points (if relevant) relating to interoperability of the network, agreed procedures on nomination and matching procedures and other agreed procedures that set out provisions in relation to gas flow allocations and balancing |
( Section 11-14) |
3.1.2 m) Description of the methodology and process used to calculate the technical capacity |
no data |
3.3. (4), (5) Capacities, nominations and renominations, actual physical flows, gross calorific values |
|
3.3. (1) f) Planned and actual interruptions |
Interruptions |
3.3. (1) g) Planned and unscheduled interruptions |
Interruptions |
3.4 (1) u. (2) Information on secondary trading |
no data |
3.4 (3) Balancing services |
(Section 13, Section 14) |
3.4 (4) Further flexibility service of TSO |
no data |
3.4 (5) Amount of gas in the transmission system and the forecast |
|
3.4 (6) User-friendly instruments for calculating tariffs |
Tariffs |
Other information